soma medication for migraines buy soma online no prescription soma pills street price

xanax withdrawal seizure time xanax no prescription xanax withdrawal experience

valium era mp3 download valium online valium dosage dentist

ambien sublingual administration buy ambien ambien cr generic zolpidem

tramadol hcl 50mg tab dosage buy tramadol no prescription tramadol hcl overdose symptoms

tramadol for dogs and humans generic tramadol order tramadol overnight mastercard

Rosenberg to celebrate completion of Blume Road Improvement Project

The City of Rosenberg will held a ribbon-cutting ceremony for Blume Road, on Tuesday, October 23. Members of the Rosenberg City Council, along with members of the project team was on hand to celebrate the completion of the improvement project which began in July of 2011. The ribbon cutting was held near Macario Garcia Park (716 Blume).

The Blume Road Improvement Project included widening, utility and drainage improvements from Klauke to Spur 529. The completed roadway is now three concrete lanes with a designated center turn lane and curb and gutter. Sidewalks were constructed down the east side of the roadway for the full project length, and on both sides of the road in the residential sections for improved pedestrian access.

Short URL:

Posted by on Oct 24 2012. Filed under Rosenberg. You can follow any responses to this entry through the RSS 2.0. You can skip to the end and leave a response. Pinging is currently not allowed.

You must be logged in to post a comment Login

Search Archive

Search by Date
Search by Category
Search with Google
Log in | Copyright © 2015 by | All rights reserved.