when do xanax pills expire buy generic xanax alprazolam 0 5mg medley

cheap tramadol next day cheap tramadol painless tramadol withdrawal

soma kerala palace soma online pharmacy soma 2012

hydrocodone bitartrate syrup side effects hydrocodone 750 mg hydrocodone dosage erowid

anxiety xanax yellow bars xanax online no prescription xanax dosage 1mg

how much does generic valium cost valium online no prescription buy valium online overnight delivery

ambien side effects yahoo ambien cost valium vs ambien insomnia

can you get arrested for buying tramadol online tramadol generic buy tramadol 24x7

valium side effects on kidneys order valium online 5mg valium high

ambien narcotic drug test ambien zolpidem como prevenir la contaminacion del medio ambiente wikipedia

Rosenberg reclaimed Water Distribution System Expansion

The City’s contractor, Trans-Tex, has begun work on the expansion of the City’s reclaimed water distribution system to provide reclaimed water for irrigation purposes at the B. F. Terry High School campus.

Work will occur in the rights-of-way along Louise Street from I69 (US59) to Airport Avenue, along Airport Avenue from Louise to B.F. Terry High School, and along a short section of Avenue N located near the football field and track facilities.

The project is anticipated to be completed by October 30, 2013. Drivers are asked to exercise caution in the area. General project questions may be directed to Citizen Relations at (832) 595-3310.

Short URL: http://www.fortbendstar.com/?p=32027

Posted by on Jun 27 2013. Filed under Rosenberg. You can follow any responses to this entry through the RSS 2.0. You can skip to the end and leave a response. Pinging is currently not allowed.

You must be logged in to post a comment Login

Search Archive

Search by Date
Search by Category
Search with Google
Log in | Copyright © 2011 by Fortbendstar.com | All rights reserved.